Industrialized construction in galvanized steel.
Steel framing for homes and buildings: cold-formed profiles, precise shop drawings and dry assembly. From Argentina to Spain.
What is steel framing
It is a light-frame building system: galvanized, cold-formed steel studs and tracks that form structural panels. Walls are closed with boards and insulation, all assembled dry.
Because profiles are cut and punched to measure, the building reaches the site almost like a kit, and assembly is orderly, predictable and low-waste.
Industrialized
Profiles and panels are prepared to exact dimensions, cutting down custom work on site.
Light and strong
A low-weight structure that allows simpler foundations and suits multi-storey work and extensions.
Clean and recyclable
Dry assembly, less waste, and a material that can be recycled at the end of its life.
What we do
We support the project from design to delivery of profiles and panels.
Design and engineering
Architecture and structure designed for the system from the start, with calculations to each country’s current standards.
Shop drawings and modelling
Every profile is modelled, numbered and documented, to cut errors and queries on site.
Machined profiles
Galvanized steel profiles cut, punched and marked to the project’s measurements.
Panels and assembly support
Prefabricated panels and technical support for an orderly assembly on site.
From drawing to site
Design
Architecture, structural calculation and panel definition.
Shop drawings
Each profile is modelled, numbered and prepared for manufacture.
Manufacture
Machined profiles and panels, ready to ship.
Assembly
Dry assembly on site, with cladding and finishes.
Projects
Built work and developments in steel framing.
Argentina and Spain
Argentina
Projects built to local standards and materials, from Mar del Plata to the whole country.
Spain
Machined profiles and industrialization solutions for the European market.
Frequently asked questions
Is a steel framing house strong?
Yes, when a professional calculates the structure to the country’s standards and it is built with the specified profiles and fixings.
How long does a build take?
It depends on the project. Lead times are usually shorter because profiles arrive prepared and assembly is dry, but each case needs its own assessment.
What are the walls closed with?
With boards (gypsum, cement or OSB, depending on use) over thermal and acoustic insulation. The combination is defined in the project.
Do you work in Argentina and Spain?
Yes. Each project is adapted to its country’s standards, materials and suppliers.
How do I get started?
Write to us with a description or your drawings. We will tell you what information is missing and how to continue.
Tell us about your project
Leave your details and a short description. We reply by email.